Projects
-
Owner/Customer
West Vincent Township -
Project Type
Public Project -
Our Role
Prime Contractor -
Engineer
ARRO Consulting, Inc. -
Start/Finish
8/19 - 11/19
Berg Construction was contracted by the Township of West Vincent to use various methods of removing and replacing asphalt on multiple different roads. We were contracted to perform asphalt pulverization & asphalt milling on different portions of roadway. After using these methods to remove the existing asphalt, Berg repaved the roadways with over 3500 tons of asphalt.
Project Highlights:
- Asphalt ulverization 17,000+ SY
- Pave 3500+ Tons