  • Location
    New Tripoli, PA
  • Owner/Customer
    Keystone Manufacturing & Keystone Steel Structures
  • Project Type
    Commercial
  • Our Role
    Subcontractor
  • Engineer
    Beitler Land
  • Start/Finish
    May 2016 – November 2016

Project Highlights:

• Erosion control
• Prepare building pad
• Dig footers
• Storm water
• Prepare site for paving
• Prepare site for concrete
• Final grading

Berg was contracted to complete all the site work related to a new manufacturing facility. We started by completing a bypass swale for the DEP and then installed storm pipe, basins, and stone sub base for paving and concrete. We also helped lower costs by lowering the building by 12” to reduce the cost of imported soil. The owners of the project stop by weekly and said we did a great job and were very pleased. It was a great experience working with Keystone Steel Structures and their team and we completed the work in a timely manner.