Project Highlights:

• 30,000 square foot building pad
• 650 linear feet of pipe work
• Installation of 2 detention/bio infiltration basins
• 1600 square yards of paving
• 640 linear feet of curb
• 20,000 cubic yards of earth moved
• Installed all E&S control measures
• Installed storm water management basins