  • Location
    West Chester, Pennsylvania
  • Owner/Customer
    Hershey Mills HOA
  • Project Type
    Special Projects
  • Contract Value
    $300,000
  • Our Role
    Primary Contractor
  • Engineer
    Walsh & Associates
  • Start/Finish
    February 2024-August 2024

Phase 1 involved the enlargement of an existing retention pond within a 55+ community adjacent to a private golf course, addressing ecological and capacity concerns:

  • Removal of trees to facilitate the expansion of the pond.
  • Installation of erosion and sedimentation controls to prevent soil runoff during construction.
  • Placement of approximately 300 linear feet of temporary timber access matting for construction access.
  • Excavation and export of approximately 2,600 cubic yards of fill to create the expanded section of the pond.
  • Shaping and forming of the pond’s new section to blend seamlessly with the existing pond structure.

Phase 2 focused on improving the pond’s water quality and capacity through silt removal:

  • Draining of the existing pond to facilitate the removal of accumulated silt.
  • Use of a water sediment trailer for dewatering the pond effectively.
  • Export of approximately 1,500 cubic yards of silt to enhance the pond’s functionality and maintain ecological balance within the community.