Projects
-
Location
King of Prussia, Pennsylvania -
Owner/Customer
ARCO Murray -
Project Type
Special Projects -
Contract Value
$225,000 -
Our Role
Subcontractor -
Engineer
Earth Engineering Incorporated -
Start/Finish
December 2023-Febuary 2024
The project focused on addressing damage caused by a sinkhole beneath an 18″ HDPE pipe:
- Removal and replacement of the damaged 18″ HDPE pipe, which extended 50 feet from the sump pit to the failure point.
- Undercutting and removal of unsuitable soils from the work area to ensure a stable foundation.
- Installation of an inverted filter within the undercut area, followed by backfilling with suitable material to restore integrity.
- Backfilling around the replaced pipe with compaction to ensure stability and support.
- Placement of 150 square feet of asphalt over the work area, restoring the surface beneath the TopGolf play area.